Civic façade — a worked example
Your studio · Ho Chi Minh City, Vietnam · 2026
A template case study showing the structure: intent, constraints, numbers, fixtures and what the scheme taught. Replace it with real work.
Placeholder imagery. The photographs on this
entry are generated stand-ins that exist to demonstrate the layout. Replace the files in public/projects/example/ and set placeholder: false.
Generated placeholder imagery — no photographer credit applies · click any image to enlarge
- Façade luminance
- 4.2 cd/m²
- Environmental zone
- E3
- Exterior CCT
- 2700 K
- Curfew
- 23:00
- Control
- DALI-2 + DMX
- Connected load
- 3.1 kW
This entry exists so you can see the layout working. Copy the file, change the frontmatter, drop real photographs into
public/projects/<your-folder>/, and setplaceholder: false.
The intent
The brief asked for the building to “stand out at night”. The scheme argues the opposite: at 4.2 cd/m² average façade luminance the building sits below the commercial frontage opposite, and reads as calm rather than loud. Standing out was achieved by contrast with the context, not by output.
The constraints that shaped it
Environmental zone E3 capped façade luminance at roughly 25 cd/m² — not binding here, but the vertical illuminance limit at the residential block to the north was. That single receptor determined the aiming of the entire upper tier.
A 23:00 curfew meant the scheme had to be designed twice: a full evening state, and a reduced state that keeps the entrance and wayfinding legible while the façade layer switches off entirely.
No uplighting was possible at the base — there is no soffit or cornice to catch light that misses the wall, so anything aimed upward would have gone straight to sky. The base is lit downward from a concealed slot at the underside of the first-floor overhang instead.
What it taught
The mock-up changed the fixture. The first grazing sample at 200 mm offset made the masonry look flat; at 120 mm the course lines read properly. No calculation predicted that — only the sample on the actual stone did.
Internal light was the biggest lever. Coordinating the interior scheme’s evening state, so occupied floors read as warm and consistent, did more for the night image than any external fitting. That coordination has to happen at concept, not at commissioning.
The curfew state needed its own presentation. Shown as a designed condition it was accepted immediately. Had it appeared at handover as “the façade turns off at 11”, it would have read as a fault.
Updated 23 July 2026